Ways out of 4/5 troubles
Decide we do not need it. Back t o 4/4 (the SVT TDR)
Take the hit: Level 2 will have to wait.
Limit 4/5 to high Pt tracks (e.g. displaced high Pt lepton for exotic) ?
- Threshold will be adjustable at any time (4 GeV looks a good one)
- Work in progress within SVT, but needs input from collaboration.
Decide what to do according to which Level 1 trigger fired.
- Looks interesting
- Too bad we have no way of doing now
- Not clear if it may ever be possible
- But “Necessity is the mother of invention”